How Oil
Drilling Works |
|||||||||||||||
| by
Craig C. Freudenrich, Ph.D. |
|||||||||||||||
In January 2001 alone, the United States produced an estimated 181 million barrels of crude oil and imported 273 million barrels from other countries. This oil gets refined into gasoline, kerosene, heating oil and other products. To keep up with our consumption, oil companies must constantly look for new sources of petroleum, as well as improve the production of existing wells. How does a company go about finding oil and pumping it from the ground? You may have seen images of black crude oil gushing out of the ground, or seen an oil well in movies and television shows like "Giant," "Oklahoma Crude," "Armageddon" and "Beverly Hillbillies." But modern oil production is quite different from the way it's portrayed in the movies. In this edition of HowStuffWorks, we will examine how modern oil exploration and drilling works. We will discuss how oil is formed, found and extracted from the ground.
Oil Exploration Forming Oil
Over the years, the organisms decayed in the sedimentary layers. In these layers, there was little or no oxygen present. So microorganisms broke the remains into carbon-rich compounds that formed organic layers. The organic material mixed with the sediments, forming fine-grained shale, or source rock. As new sedimentary layers were deposited, they exerted intense pressure and heat on the source rock. The heat and pressure distilled the organic material into crude oil and natural gas. The oil flowed from the source rock and accumulated in thicker, more porous limestone or sandstone, called reservoir rock. Movements in the Earth trapped the oil and natural gas in the reservoir rocks between layers of impermeable rock, or cap rock, such as granite or marble.
These movements of the Earth include:
Finding Oil
In seismic surveys, a shock wave is created by the following:
The shock waves travel beneath the surface of the Earth and are reflected back by the various rock layers. The reflections travel at different speeds depending upon the type or density of rock layers through which they must pass. The reflections of the shock waves are detected by sensitive microphones or vibration detectors -- hydrophones over water, seismometers over land. The readings are interpreted by seismologists for signs of oil and gas traps. Although modern oil-exploration methods are better than previous ones, they still may have only a 10-percent success rate for finding new oil fields. Once a prospective oil strike is found, the location is marked by GPS coordinates on land or by marker buoys on water.
Preparing to Drill Once the legal issues have been settled, the crew goes about preparing the land:
Once the land has been prepared, several holes must be dug to make way for the rig and the main hole. A rectangular pit, called a cellar, is dug around the location of the actual drilling hole. The cellar provides a work space around the hole, for the workers and drilling accessories. The crew then begins drilling the main hole, often with a small drill truck rather than the main rig. The first part of the hole is larger and shallower than the main portion, and is lined with a large-diameter conductor pipe. Additional holes are dug off to the side to temporarily store equipment -- when these holes are finished, the rig equipment can be brought in and set up. Setting Up the Rig
Drilling
The crew sets up the rig and starts the drilling operations. First, from the starter hole, they drill a surface hole down to a pre-set depth, which is somewhere above where they think the oil trap is located. There are five basic steps to drilling the surface hole:
Once they reach the pre-set depth, they must run and cement the casing -- place casing-pipe sections into the hole to prevent it from collapsing in on itself. The casing pipe has spacers around the outside to keep it centered in the hole. The casing crew puts the casing pipe in the hole. The cement crew pumps cement down the casing pipe using a bottom plug, a cement slurry, a top plug and drill mud. The pressure from the drill mud causes the cement slurry to move through the casing and fill the space between the outside of the casing and the hole. Finally, the cement is allowed to harden and then tested for such properties as hardness, alignment and a proper seal.
Drilling continues in stages: They drill, then run and cement new casings, then drill again. When the rock cuttings from the mud reveal the oil sand from the reservoir rock, they may have reached the final depth. At this point, they remove the drilling apparatus from the hole and perform several tests to confirm this finding:
Once they have reached the final depth, the crew completes the well to allow oil to flow into the casing in a controlled manner. First, they lower a perforating gun into the well to the production depth. The gun has explosive charges to create holes in the casing through which oil can flow. After the casing has been perforated, they run a small-diameter pipe (tubing) into the hole as a conduit for oil and gas to flow up the well. A device called a packer is run down the outside of the tubing. When the packer is set at the production level, it is expanded to form a seal around the outside of the tubing. Finally, they connect a multi-valved structure called a Christmas tree to the top of the tubing and cement it to the top of the casing. The Christmas tree allows them to control the flow of oil from the well.
Once the well is completed, they must start the flow of oil into the well. For limestone reservoir rock, acid is pumped down the well and out the perforations. The acid dissolves channels in the limestone that lead oil into the well. For sandstone reservoir rock, a specially blended fluid containing proppants (sand, walnut shells, aluminum pellets) is pumped down the well and out the perforations. The pressure from this fluid makes small fractures in the sandstone that allow oil to flow into the well, while the proppants hold these fractures open. Once the oil is flowing, the oil rig is removed from the site and production equipment is set up to extract the oil from the well.
Extracting the Oil
In the pump system, an electric motor drives a gear box that moves a lever. The lever pushes and pulls a polishing rod up and down. The polishing rod is attached to a sucker rod, which is attached to a pump. This system forces the pump up and down, creating a suction that draws oil up through the well. In some cases, the oil may be too heavy to flow. A second hole is then drilled into the reservoir and steam is injected under pressure. The heat from the steam thins the oil in the reservoir, and the pressure helps push it up the well. This process is called enhanced oil recovery. With all of this oil-drilling technology in use, and new methods in development, the question remains: Will we have enough oil to meet our needs? Current estimates suggest that we have enough oil for about 63 to 95 years to come, based on current and future finds and present demands.
|
|||||||||||||||
|
ELS AND COMPANY INC. |
| P.O. Box 969 |
| Grand Bend, Ontario N0M 1T0 |
| Phone: 519-913-2267 |
| Fax: 519-913-2159 |
| bruce@elsandcompany.com |
| www.elsandcompany.com |
Land Acquisition Pipeline Locating Wind Power Royalties & Database Information Mapping Home